Custom Moduling

How a Custom Scale Model Is Made

Every project runs through six stages — from requirements and drawings to packing, delivery and support. Stage durations depend on scope and complexity and are confirmed per project.

How a project runs

Every project runs through six stages: requirements and drawings, technical scope and feasibility, proposal and quotation, design and specification approval, production with checkpoint inspection, then packing, delivery and support. Stage durations depend on scope and complexity and are confirmed per project.

The six stages

STEP 1

Requirements review

You provide
Purpose, destination, size range, budget, target date
We deliver
Feasibility feedback and how we would take it on
You confirm
Go / no-go
STEP 2

Technical scope

You provide
Scale, drawings, materials, detail level, dynamic features
We deliver
Technical scope and assumptions
You confirm
Scope agreement
STEP 3

Proposal & quotation

You provide
Confirmation of scope
We deliver
Written proposal: inclusions, exclusions, schedule assumptions, payment and change rules
You confirm
Quote approval
STEP 4

Design approval

You provide
Feedback on drawings, key sections, colors, lighting
We deliver
Design package and written specification
You confirm
Design sign-off
STEP 5

Production & inspection

You provide
Checkpoint confirmations
We deliver
Progress records; pre-assembly and function tests where needed
You confirm
Checkpoint approvals
STEP 6

Packing & delivery

You provide
Delivery address and site conditions
We deliver
Packing for transport, delivery and support
You confirm
Delivery acceptance

What is built into the model

Lighting runs, water systems and landform layers are made as separate systems before assembly.

Close-up of blue and green model lighting channels on a plant model
Water treatment plant model with green-lit basins
Partly finished relief model showing landform layers

Where the precision comes from

Colour is matched against the reference image on the bench, not estimated. Small parts are placed by hand, one at a time. Interiors are built out to the level of furniture and figures.

2.7s · silent loop

3.1s · silent loop

Interior cut-away detail of a furnished unit model with miniature figures, table and clothing rails

Which of these a model carries is fixed in the technical scope stage.

The build, step by step

Every model runs through the same production and quality workflow before it leaves the workshop:

  1. 1
    Preparation

    Collect the project materials — CAD drawings, renderings and landscape design plans — and convert them to model scale.

  2. 2
    Base

    Build the wooden base and apply the baked-on paint finish.

  3. 3
    Terrain

    Shape the landform in foam board and plaster, then treat the surface.

  4. 4
    Buildings

    Fabricate the buildings from ABS sheet and acrylic to the CAD drawings, with detail work and lighting installed as they go.

  5. 5
    Roads

    Lay the main roads in matte-grey stainless steel and the sidewalks in stone-look or tile material.

  6. 6
    Landscaping

    Set the artificial planting and landscape features for a believable setting.

  7. 7
    Atmosphere

    Install advertising neon and intelligent lighting systems to build the commercial scene.

  8. 8
    Commissioning & acceptance

    Commission the whole model so lighting and sound run correctly, then carry out final acceptance.

What to prepare before you ask for a quote

  • Purpose

    What the model must demonstrate or explain

  • Drawings or references

    Site plan, layout, equipment list, or reference images

  • Target size & scale

    Footprint and height limits, preferred scale

  • Dynamic features

    Lighting, motion, water, digital integration needs

  • Environment

    Indoor / outdoor, public access, maintenance access

  • Timing

    Target date and fixed events (openings, shows)

  • Budget range (optional)

    Helps us scope realistically

If you do not have drawings yet — reference images and a written description are enough for a first review.

Cost & timeline

Scale models are quoted by scope, not by a standard price list. Five factors drive the cost of a build:

Size & scale
Larger footprints and finer scales require more material and labour.
Design complexity
Curved facades, cut-away sections and dense detail raise the build time.
Materials & finishes
ABS, acrylic, stainless steel and specialty coatings each carry different cost and lead-time implications.
Dynamic systems
Lighting circuits, water features, moving parts and digital integration add engineering and commissioning time.
Repeated elements
Standardised repeats (street trees, lamp posts, identical building modules) cost less per unit than one-off pieces.

Indicative bands start around US$140-7,000, US$7,100-14,000 and US$15,400-28,000 (ex-works, before international freight, duties and installation) and continue upward with project scale. Production lead time typically falls in bands of 3-10, 11-30 or 31-45 days. We review your project and return a project-specific quotation with the assumptions stated. The USD bands above are converted at a fixed reference rate for reference only; final pricing is quoted per project.

Frequently asked questions

Have drawings? Let's see what they can become.

Share your drawings, target size and intended use. We will review the project and outline the next steps.